AProject
  • Ideas for giving
  • Construction
  • Home Ideas
  • Repair
  • Design
  • Real estate
  • Finishing
ECOBuild – all about construction
  • Ideas for giving
  • Construction
  • Home Ideas
  • Repair
  • Design
  • Real estate
  • Finishing

Subtleties in the repair and filling of floors

  • September 5, 2017

Today we will talk about repairs, namely about the filling and repair of the sexes. It is not for nothing that they say on how you make the floor, it depends on how all repairs will go to the building, and in the future and how all work will go in this structure. Today, concrete floors are widely popular. They are used not only in production, warehouses, but also in residential premises. Pouring floors can be both the final option for repair and intermediate, since builders offer their customers to make both polymer and bulk floors with the appearance of new technologies.

The most popular today is the filling of sex. The composition, as a rule, includes small sand, some types of cements. Thanks to this consistency, the surface dries quickly. But at the same time it is worth remembering that before using the apartments, it is worth covering the surface very well with a primer. Using the apartments during repair, you will be satisfied, and your floors will serve you a good and long -term service. It is worth remembering that if the work on filling the floors does a good company, then you must certainly learn from them about the guarantee of their work.

If you do the job yourself, then after covering the flooring with a primer you need special darts, they are also called beacons that will show the height of the filling. They need to be placed at a distance of about one and a half meters from each other. Apartments can be used in several layers. In the future, this is an ideal basis for tiles, laminate, linoleum. But the main rule is that you should not rush let it pass for a maximum of a month, so that everything is finally hardened.

A qualified specialist of the company produces professional installation of sockets of almost any complexity. After the call, the master arrives at the specified time and performs work on installing sockets or switching on the highest level and at the same time at the public price.

Share
Tweet
Pin it
Share
Share
You May Also Like
View Post

Decorative jointing: features, technology and rules

  • March 3, 2025
View Post

Features of repairing a crack in a floor screed

  • March 3, 2025
View Post

Selecting plaster for finishing ceilings and application techniques

  • March 3, 2025
View Post

Repair and tools

  • January 24, 2025
View Post

Coloring metal surfaces

  • January 20, 2025
View Post

Strengthening the foundation

  • January 16, 2025
View Post

Quartz stone in the interior: main advantages

  • January 15, 2025
View Post

Cornice on the window

  • January 14, 2025
Featured Posts
  • A little about artificial stone
    • December 18, 2017
  • Construction of a country house
    • March 23, 2018
  • 3
    Non-destructive ultrasonic testing method for structures
    • March 3, 2025
  • 4
    White finishing materials for walls: how to choose
    • March 3, 2025
  • Solution for grouting tiles
    • July 6, 2017
Recent Posts
  • Decorative jointing: features, technology and rules
    • March 3, 2025
  • Features of repairing a crack in a floor screed
    • March 3, 2025
  • Selecting plaster for finishing ceilings and application techniques
    • March 3, 2025
ECOBuild – all about construction
  • © ECOBuild – ecobuildit.com, 2017-2024.

Input your search keywords and press Enter.