AProject
  • Ideas for giving
  • Construction
  • Home Ideas
  • Repair
  • Design
  • Real estate
  • Finishing
ECOBuild – all about construction
  • Ideas for giving
  • Construction
  • Home Ideas
  • Repair
  • Design
  • Real estate
  • Finishing

Installation of drainage systems

  • December 12, 2017

Gathering systems are necessary for the roofing system, and their installation is possible at any stage, but it is better to do this after the roof is completed. Fastards for gutters are installed during the installation of the roofing. For fastening, use brackets or long holders, as well as short, if the design allows. After the roof is covered with a place for fastening remains on the frontal board. It will also not be superfluous to learn more about the SRO certificate in construction on the site .

At the next stage, it is necessary to determine the place of installation of extreme holders, taking into account the fact that the inclination of this system should be from three to five mm per m. p. After installation of extreme holders, the length between others is calculated, it should be no more than fifty centimeters. Fastening is carried out in a wooden structure with four self -tapping screws. The third screws are fixing and installed after all previous. There are times when the supporting structure cannot be kept, and cracks appear on the roof. In this case, there is a dismantling and strengthening of structures using a beam, as well as filling the boards across the crate. If you adhere to all the above rules, then the installation of the drainage system seems easy and not forced.

Share
Tweet
Pin it
Share
Share
You May Also Like
View Post

Wall decoration with porcelain tiles: rules, options and

  • March 3, 2025
View Post

Laminate on walls: options and installation rules

  • March 3, 2025
View Post

White finishing materials for walls: how to choose

  • March 3, 2025
View Post

Proper ventilation equipment in the bathroom

  • January 22, 2025
View Post

Doors installation rules

  • January 22, 2025
View Post

How to choose high -quality PVC pipes

  • January 22, 2025
View Post

Processing by stone floor

  • January 20, 2025
View Post

Polycarbonate visor

  • January 15, 2025
Featured Posts
  • Creating a metal door with your own hands
    • March 13, 2018
  • Carpet as it is
    • November 17, 2017
  • Housing Home Heating System
    • July 28, 2017
  • How to competently paint the walls in the apartment
    • August 17, 2017
  • Gluing the plinth on the corner
    • January 17, 2025
Recent Posts
  • Decorative jointing: features, technology and rules
    • March 3, 2025
  • Features of repairing a crack in a floor screed
    • March 3, 2025
  • Selecting plaster for finishing ceilings and application techniques
    • March 3, 2025
ECOBuild – all about construction
  • © ECOBuild – ecobuildit.com, 2017-2024.

Input your search keywords and press Enter.