Setting the floor is a very important part of the repair. Floor screeds are concrete, cement-sand and wooden. They are divided into 2 main types: a bulk floor and a dry screed.
The laying of flooring depends on the leveling of the floor. It is better to align after dismantling and work on the installation of internal communications.
If you are also going to change furniture, then you should buy a dining group, but only after you do all the draft work, including you will make the floor.
Screed material is selected taking into account your needs. If you want to align the floor with the help of rapidly solid bulk floors, which themselves are aligned – the floor must be carefully prepared. First you need to clean the entire floor surface of dirt and dust. Partitions and walls must be isolated before the start of work. Between the bulk floor and the base, a primer is carried out. The thickness of the thin bulk floor is from 5 to 30 mm. The consistency of the solution for filling should be thick, without lumps and not spread on the floor. The solution can only be suitable for an hour. After the work done, look at whether there are no cracks or air voids on the surface. The screed needs to be moistened for about a week so that the floor does not crack. It is very difficult to install a dry screed on your own. If you do not comply with at least one subtlety of installation technique, we can assume that all the work is wasted. A qualified master can perform this work much faster and better.
Be sure to inform the master about the marriage discovered. It is necessary to eliminate the error urgently, otherwise there may be more problems. The presence of voids in the screed is determined by a light tapping. If there were a lot of cracks, then it is necessary to primer the floor and pour again. Minor cracks can be covered with a solution.