If you purchased an apartment in a new house, then you need to level the floor. This can be done using a special self -leveling mixture. Before work, the base must be thoroughly cleaned, and then primed. After this, it is required to prepare a solution of the mixture according to the instructions attached to the packaging of building materials.
If suddenly the solution began to sprinkle, and water appeared in it, before work, you need to thoroughly mix the mixture thoroughly. Then it is necessary to carefully pour the prepared solution on the floor. If bubbles appeared on it, they must certainly get rid of the needle roller. It needs to be rolled over the entire surface, putting items on his feet.
It will be possible to advance on the floor after 12 hours. And he will gain final strength after 72 hours. At this time, you can do other things: for example, you can buy boxes for moving and slowly put things in them.
You need to know that the self -leveling floor cannot be compulsory drying. This reduces the strength of the flooded base of the floor. On the bags with the mixture, the period is indicated during which the mixture completely hardens and polymerizes. It is not recommended to neglect them. You can use calorifiers and thermal guns only in winter at low temperatures.
The temperature regime must comply with the instructions that are applied to the label of the bag with the mixture. When such a floor completely dries and hardens, it is suitable for laying the flooring of any kind.
As you can see, it is completely not difficult to make a self -leveling floor on your own. If you approach the case carefully, then the result will please, and it will be possible to start finishing.