At first glance, the foundation was poured under. The fence does not seem difficult, but you need to approach work responsibly, because the durability of the fence depends on the quality of installation. Most often, the technology of laying the strip foundation is used, the work takes about three days. For pillars, the foundation is poured with a depth of 80 cm and 40 cm wide., For the usual foundation, the width remains the same, and the width can be reduced to 25 cm and it should rise above the ground level by 15 cm. Today, buying an apartment in Kamyshin has become much easier, go to the site – and you can consider photos of all the apartments that are on sale, find out their cost and you can agree to buy without leaving your home.
Initially, you need to make markings for the foundation, and drive the peg over the perimeter of the area on which the rope is pulled. I focus on this rope dig a trench of the given sizes. If the support pillars are installed, then before filling the concrete, it is advisable to reinforce the hole. Until the concrete is frozen, pillars are inserted into it. Sand and crushed stone are laid on the bottom, they play the role of drainage. It is also necessary to reinforce correctly, the metal rod is dug up vertically, and then a horizontal rod is attached to it, they are connected by wire or welding. Reinforcement is carried out to the height of the future foundation.
Next, a formwork of plywood or boards is installed, it is fixed with stakes, so that after pouring the foundation it does not spread. Concrete should be liquid enough so that it does not leave voids when spreading. If after pouring the foundation to cover it with a film made of polyethylene, it will dry slower, which means it will be more durable.