Consider the procedure for laying tiles on the floor. To find out how much it will be needed, you need to measure the area of the room, take into account the biases and pilasters. Divide the resulting result into an area of one tile. Add a few to the reserve. The tile can be glued. The method depends on the composition of the glue. If it is based on synthetic resins, rubber, then start from the front door, and if you have dispersion glue, then from the wall opposite to the entrance, because you can’t walk along the stacked tile. To make the tiles softer, it can be heated to 40 degrees. To glue the tile, apply a small layer of glue to the base and wait 10-15 minutes until it dries.
Apply glue to the tiles and press to the floor. Then, with your hand or roller, straighten up. You can not glue, but put. Put in one plane on a cement-sand mortar. First, tiles are placed. The floor level is checked for them. The solution is filled with free space. Now you need to lay out a row. Start from the lighthouse. For each of the tiles lightly tapped to besiege. A row must be aligned under the rail in the horizontal and vertical direction with kiyanka.
Then you should mix cement with water and pour this solution into the recess of the seams (only along the seam). Rub out a plaster grater inclined at an angle of 30 degrees. At the end of the work, check the presence of air shells in the seams and remove excess cement. On the finished floor lies the boards so as not to walk on the tile. Every other day you remove excess cement from the surface of tiles with hydrochloric acid. Do not forget to neutralize the acid, otherwise it will begin to corrode the solution in the seams. In a week you can walk on your beautiful floor.
Look for a special repair equipment that can be taken for a while? It seems to your attention to the rental of an electric jack of a hammer, with which you can, for example, remove the old layers of asphalt to lay a new. Contact us and find out the conditions. We will make an individual application for you!