The creation of a water or apartment water supply system includes a large number of works. Therefore, let’s look at what work, in what priority it is necessary to perform in order for you to have a general picture. This will make it possible to independently control the performance of the task by employees.
At the initial stage, if this is a private house, a system of collecting sewer waters is created. That is, a drain pit and a trench is made for laying tubes. And also a water collection point is created and water is brought to the structure. After this, the working scheme of the water supply point and the drainage points are made. According to this scheme, the installation of pipes, cranes and other equipment will occur.
The next step is one of the most important, and the functionality of the entire water supply system will depend on its implementation. This is the installation of the sewage system, and all the installation work should occur using a level or leveling, since it is necessary to create a natural slope for sewage drainage.
The next stage is the installation of pipes according to the working scheme and the installation of locking equipment (cranes, valves), after which the system is being checked without fail. To do this, it is launched for at least one day and check all threaded and welding joints for water leaks.
Having fulfilled these conditions, at the next step, the system is installed in its place (for hidden wiring) and the subsequent decoration of the premises.
Small advice. If you have water supply from the general water supply system, install a compensation gearbox to equalize and discharge excess pressure in the system. This will allow you to avoid the most common problems associated with public water supply (pressure drops).